Calculators / Burial depth

Burial depth calculator

The minimum cover for a direct buried cable or a raceway under CEC 2024 Rule 12-012 and Table 53, and what goes in the trench with it. Free, no sign-up.

The run

Wiring method
Voltage

Where it runs

Vehicles over it

A driveway, a parking area or a road is a vehicular area even when it is only driven on now and then.

Mechanical protection over the run

Treated planking at least 38 mm thick, or poured concrete, concrete slabs or encasement at least 50 mm thick, 50 mm past the run on each side.

Ground

Need it under the job? SparkSheet™ saves your calculations under the job and prints them as a PDF with your logo, next to your job photos, panel schedules and plan markup.

Start 30 day free trial

What it does

Table 53 sets the minimum cover by wiring method, by voltage and by whether vehicles drive over the run. Cover is the distance from the top of the cable or raceway to finished grade, not the trench depth. Rule 12-012(3) takes 150 mm off where mechanical protection goes in the trench over the run, 12-012(8) lets a run in rock sit in a trench at least 150 mm deep grouted to the surface, and 12-012(9) lets a raceway or an armoured cable go directly under a grade-level concrete slab at least 100 mm thick when the location and depth are marked. The result card lists what the rule asks for in the trench itself: the sand bedding, the marking tape, the riser protection, the backfill and the frost allowance.

Worked examples

NMWU to a detached garage, under the driveway

Cable with no armour, 750 V and under, vehicular: 900 mm of cover. Add 75 mm of screened sand under the cable and the trench is 975 mm plus the cable. Planking over the cable brings the cover to 750 mm. The same cable through the lawn needs 600 mm.

PVC conduit to a shed, through the yard

Raceway, 750 V and under, not driven on: 450 mm. The trench is 450 mm plus the conduit. Where the lawn becomes the driveway the cover goes to 600 mm, so dig the vehicular stretch deeper rather than the whole run.

TECK90 feeder in a rock cut

Armoured cable, 750 V and under, not driven on: 450 mm in earth. In rock, a trench at least 150 mm into the rock, grouted with concrete to the rock surface, is permitted instead (12-012(8)).

Questions electricians ask

Is 18 inches enough for a PVC conduit?

450 mm is 17.7 inches, so a nominal 18 inches of cover meets Table 53 for a raceway at 750 V and under in a non-vehicular area. Under a driveway it is 600 mm, about 24 inches.

Does a driveway always add 6 inches?

No. A raceway or an armoured cable goes from 450 to 600 mm, but an unarmoured cable goes from 600 to 900 mm. The vehicular column is its own number, not an add-on.

What counts as mechanical protection?

12-012(4): treated planking at least 38 mm thick, poured concrete, concrete slabs or concrete encasement at least 50 mm thick, or other suitable material, in each case wide enough to reach 50 mm past the cables or raceways on both sides. It earns 150 mm less cover.

What goes under and over a direct buried cable?

75 mm of screened sand (4.75 mm particles at most) or screened earth, below and above, with the cables side by side and never crossing (12-012(5)). Backfill with no large rocks, paving, cinders or sharp or corrosive material (12-012(11)).

Where does the marking tape go?

About halfway between the run and grade, or a permanent marker in a conspicuous place giving the location and depth (12-012(12)).

Does the utility's service lateral follow this?

Not unless it is yours. Utility-owned underground runs follow CSA C22.3 No. 7, and anything 12-012 does not cover follows that standard or the applicable one, whichever is more stringent (12-012(16)).

What about the ampacity of a buried run?

Separate question. Sizes No. 1/0 and larger underground take the Diagram D8 to D11 tables (4-004(1)(d)), and where that depth is shallower than Table 53, Table 53 wins (12-012(2)). Size the conductor on the wire size calculator and check the run on the voltage drop calculator.

Based on CEC 2024. Design aid, not a stamped document. Checked by a Red Seal electrician at Peak Electrical Contracting, Victoria, BC.