Residential load calculator

Work out the calculated load and minimum service size for a house under CEC Rule 8-200, and check whether the existing service has room for what is being added. Free, no sign-up, with a PDF for the permit file.

The house

Leave it blank if there is none. A finished basement counts at a reduced rate.

Heating and cooling

Heat

A heat pump with supplementary baseboards is two sources. Add each one.

Heating and cooling at the same time

Appliances

A garage heater, welder, kiln or workshop sub-panel. Add them up.

Existing service

Leave it unticked for a new build, or when only the required service matters.

Proposed added loads

A welder, kiln or workshop sub-panel being added.

Everything here is counted on top of the loads above, and the result gives the new required service.

Need it under the job? SparkSheet™ saves your calculations under the job and prints them as a PDF with your logo, next to your job photos, panel schedules and plan markup.

Start 30 day free trial

What it does

Single dwelling service and feeder calculation per CEC 2024 Rule 8-200(1): the itemized load of Subrule 1)(a) against the floor of 1)(b), the larger of the two in watts and amps, the next standard service size, and the minimum copper and aluminum service conductors at 75 °C from Tables 2 and 4. Tick the existing service to check it against the calculated load, and put the additions under Proposed added loads to get the new required service. The PDF prints the inputs, the steps and the result on one page for the permit. Suites, row housing and apartment buildings (8-200(2), 8-202) are in the SparkSheet™ app.

How the loads are counted

The service is the next standard size at or above the calculated amps at 240 V (60, 100, 125, 150, 200, 320, 400 A). The conductors are the Table 2 and Table 4 minimums at 75 °C per 4-004 and 4-006. A utility may accept smaller dwelling service conductors under its own rules. Voltage drop is not included: there is a separate calculator for it.

Worked examples

Gas house, 2,000 ft², adding a 32 A EVSE

Range, 60 gallon tank, dryer. Basic 7,000 W, range 6,000 W, tank and dryer 9,500 W at 25% is 2,375 W: 15,375 W, under the 24,000 W floor, so 100 A. Add a 32 A charger at 7,680 W: 23,055 W, still under the floor. The existing 100 A service carries it. A 48 A charger pushes it past the floor.

All-electric, 1,800 ft² plus a 600 ft² finished basement, then a hot tub

Heat pump on a 40 A breaker with 3,000 W of supplementary baseboard, range, tank, dryer. Basic 7,000 W, heat 12,600 W (heat pump 9,600 plus baseboard 3,000, over the 9,600 W cooling side), range 6,000 W, other loads 2,375 W: 27,975 W, 116.6 A, 125 A service, #1 AWG copper or #2/0 AWG aluminum. A 40 A spa pack adds 9,600 W at 100%: 37,575 W, 156.6 A, 200 A service. On an existing 125 A service that is over by 32 A.

Small house, nothing electric but lights and plugs

1,200 ft², gas heat, gas range, gas water heater: 6,000 W. The floor still applies: 24,000 W, 100 A.

Questions electricians ask

Does an EV charger need a 200 A service?

Not by itself. On a gas-heated 100 A house a 24 A or 32 A charger usually fits under the floor, and an EVEMS keeps a larger one out of the calculation (8-106(11)). Run the numbers before quoting the upgrade.

Is the hot tub really at 100%?

Yes, 8-200(1)(a)(v). It is the load that most often forces the upgrade.

How does the finished basement count?

75% of its area, with a ceiling over 1.8 m (8-110). Unfinished space is left out.

Gas range: what changes?

No range allowance, and the other loads over 1,500 W go in at 100% of the first 6,000 W instead of 25% each (8-200(1)(a)(vii)(B)).

Why a 100 A minimum on a small house?

8-200(1)(b): 24,000 W at 80 m² and up. 60 A is only possible under 80 m², and most utilities and panels make 100 A the practical floor anyway.

Suites and multi-unit?

The app does house + suite, row housing and apartments with the 8-202(3) diversity ladder and the house panel.

Which edition?

CEC 2024, CSA C22.1:24. Check your province's amendments.